Vernier Control Head

Black/Red Button

Cable Length Conversion

standard

Centimeters Meters Feet
100 1.00 3'3"
125 1.25 4'1"
150 1.50 4'11"
175 1.75 5'9"
200 2.00 6'7"
225 2.25 7'5"
250 2.50 8'5"
275 2.75 9'1"
300 3.00 9'10"
325 3.25 10"8"
350 3.50 11'6"
375 3.75 12'4"
400 4.00 13'2"
425 4.25 13'11"
450 4.50 14'9"
475 4.75 15'7"
500 5.00 16'5"
525 5.25 17'3"
550 5.50 18'1"
575 5.75 18'10"
600 6.00 19'8"
Product Code: N/A SKU: 09X Categories: , , ,
Description

Vernier control heads may be ordered as a complete assembly (head and cable attached) or separately.

Order the desired control head using the two-digit number

  • 90(small black)
  • 92(large black) or
  • 94 (large red)

The Vernier Control is recommended for operating loads up to 9 kgs (90 N), regardless of the series cable selected. The control head can withstand much higher operating loads, but human engineering factors are limited to about 9 kgs (90 N). Loads above this level can cause fatigue and discomfort to the operator’s hand and fingers. Consider alternatives if the loads for a given installation are significantly higher than 9 kgs (90 N).

Order the cable using the five-digit number from “Building a Part Number.” To order a complete assembly, combine the control head number with the desired cable number.

Example: if you desire control head #94 and cable #03329 + length, then combine to make the assembly part number 094-03329-length.

Diagrams

Diagrams

Shipping & Delivery

Estimated Delivery Times

When you've completed your purchase, Control Connections will provide an estimated delivery date, which you can review in your Order Confirmation email or online. This estimated date will vary depending on your choice of a In Stock Item or Build to Order product.

In Stock Delivery

In Stock products are ready to ship, you'll get everything you need in one purchase.

Estimated Delivery range 2 - 3 business days

Products typically have an estimated delivery time of 2–3 business days from order confirmation for shipment to Sydney, Melbourne, Brisbane, Canberra, Wollongong and Newcastle. For all other locations, estimated delivery times will be longer.

Build to Order

For build to order products, Control Connections configures to your specifications and will provide you a “ships in” date range, which is the approximate date range by which your order will ship from the warehouse. Delivery of your product after it has shipped from the warehouse will typically be within 6-14 business days.

How We Estimate Delivery Times

We aim to be as accurate as possible when estimating delivery times. However, actual delivery dates are subject to change based on a number of conditions, including:

Length of time it takes your payment to clear

Availability of items in your order

Delivery method

Shipping provider

Warehouse location

Your delivery address

Holiday periods

Control Connections estimated shipping and delivery times commence upon order confirmation. Your order will be confirmed once payment has been received by Control Connections.